How long does the design work take before a build can start?
For a domestic garden, allow roughly six to ten weeks from survey to a priced detail set, depending on how many rounds of revision you want and how quickly contractors return figures. Larger plots or anything needing a tree report take longer. Build length is set by the contractor, not by us.
Will the garden need permission or consent?
Most planting and paving does not, but raised structures near boundaries, significant level changes, work in a conservation area and anything touching a protected tree often do. We flag it at the walk-round stage and tell you what evidence an application would need before you spend money on drawings.
Do you build the garden yourselves?
No. We design and then oversee. Keeping design separate from construction means we can compare contractor prices on your behalf and inspect the work without a conflict of interest. We tender to landscape contractors we have worked with and are happy to include one of your own.
Can we use a contractor we already trust?
Yes, and it often helps. The drawing set is written so any competent landscape contractor can price and build from it. We ask for one pre-start meeting with them to walk through levels, drainage and setting out, then keep to the same site-visit schedule.
Is a small garden worth a full design?
Small gardens are less forgiving, not less complex — every mistake is in view from the house. For courtyards and narrow plots we often run a reduced scope: survey, layout plan and planting plan without a full tender pack, which suits a build by a single skilled contractor.
What happens after the garden is handed over?
You get a written establishment schedule covering watering through the first two summers, pruning in year one and two, and when to lift and divide. We return at agreed points in those two years to check how planting is settling and to adjust anything that is struggling.